Calvary Presbyterian Church
Calvary Presbyterian Church was completed and opened on Christmas Eve, 2000. It was a collaboration of the Church Elders, Ronald Sebring Associates, and Straight Edge Construction, Inc. working together that made this project a great success. Later in 2005, the basement was transformed into 5 instructional classrooms and an elevator was added to ensure the rooms were handicap accessible.
Straight Edge Construction, Inc.
P.O. Box 541; Manasquan, NJ 08736; Phone: 732-223-7859 ; Fax: 732-528-7859; www.straighte.com
Site design by Andrew Hayek
(c) 2012 Straight Edge Construction, Inc. All rights reserved.
P.O. Box 541; Manasquan, NJ 08736; Phone: 732-223-7859 ; Fax: 732-528-7859; www.straighte.com
Site design by Andrew Hayek
(c) 2012 Straight Edge Construction, Inc. All rights reserved.